首页 体育正文

皇冠现金网(www.hg108.vip):Fukushima debris removal delayed by another year

admin 体育 2022-08-28 03:03:48 4 0

皇冠现金网www.hg108.vip)是一个开放皇冠正网即时比分、皇冠现金网开户的平台。皇冠现金网开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠信用网代理开户、皇冠信用网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠最新登陆网址www.hg108.vip)实时更新发布最新最快的皇冠最新登陆代理线路网址、皇冠最新登陆会员线路网址、皇冠最新备用登录网址、皇冠最新手机版登录网址。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
版权声明

本文仅代表作者观点,
不代表本站锡林郭勒盟新闻频道的立场。
本文系作者授权发表,未经许可,不得转载。

发表评论

评论列表(0人评论 , 4人围观)
☹还没有评论,来说两句吧...