首页 社会正文

KPower gets four-year PPA extension

admin 社会 2022-08-25 13:42:39 4 0

欧博会员开户www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

足球博彩平台www.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。足球博彩平台上登录线路最新、新2皇冠网址更新最快,足球博彩平台开放皇冠会员注册、皇冠代理开户等业务。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。
版权声明

本文仅代表作者观点,
不代表本站锡林郭勒盟新闻频道的立场。
本文系作者授权发表,未经许可,不得转载。

发表评论

评论列表(0人评论 , 4人围观)
☹还没有评论,来说两句吧...